檢查專案能不能進入下一個開發階段,給出 PASS 或 FAIL 判定

中文翻譯

---
name: gate-check
description: "準備好從一個開發階段進到下一個了嗎?給出 PASS/CONCERNS/NOT ASSESSED/FAIL 的判定,附上阻礙項目和必備產出物。「我們可以進 production 了嗎?」"
argument-hint: "[target-phase: systems-design | technical-setup | pre-production | production | polish | release] [--review full|lean|solo]"
user-invocable: true
allowed-tools: Read, Glob, Grep, Write, Edit, Agent, AskUserQuestion, Bash(bash "*/.claude/skills/gate-check/../../hooks/yaml-helper.sh" resolve_config *), Bash(bash .claude/scripts/artifact-check.sh *), Bash(bash .claude/scripts/gdd-structure-check.sh*), Bash(bash .claude/scripts/adr-dep-graph.sh*), Bash(bash .claude/scripts/set-stage.sh *)
model: opus
---

!`bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys review_mode,workflow,qa.level,testing.strict,performance.enforce,team.size,project.stage,system_overrides`

上面已經解析好了,直接用;`--review` 會覆蓋 `review_mode`。沒有這個區塊的話,
用 `.claude/docs/config-resolution.md` 裡的預設值。

# Phase Gate Validation

這個 skill 負責驗證專案是否準備好進入下一個開發階段。它會檢查必備產出物、品質標準和阻礙項目。

**跟 `/project-stage-detect` 不一樣**:那個 skill 是診斷性的(「我們現在在哪?」)。
這個 skill 是規範性的(「我們準備好前進了嗎?」,並給出正式的判定)。

## Production Stages (7)

專案會依序走過這些階段:

1. **Concept** — 腦力激盪、遊戲概念文件
2. **Systems Design** — 梳理各系統、撰寫 GDD
3. **Technical Setup** — 引擎設定、架構決策
4. **Pre-Production** — 做原型、驗證 vertical slice
5. **Production** — 功能開發(Epic/Feature/Task 追蹤啟動)
6. **Polish** — 效能、playtest、修 bug
7. **Release** — 上線準備、認證

**當 gate 通過時**(或使用者明確接受 CONCERNS 判定的風險 — Section 6),要同時更新 `project.yaml` 裡的 stage(設定 `project.stage: <new-stage>`),也要把新的 stage 名稱寫進 `production/stage.txt`(單獨一行,例如 `Production`)。雙寫是為了向後相容還沒遷移的 hook。這樣狀態列會立刻更新。

---

## 1. Parse Arguments

**目標階段:** `$ARGUMENTS` 去掉任何 `--review <mode>` 這組之後剩下的部分(留白 = 自動偵測目前階段,再驗證下一個轉換)。`/gate-check --review full` 沒有指定任何階段。

注意:在 `solo` 模式下,director 的派生(CD-PHASE-GATE、TD-PHASE-GATE、PR-PHASE-GATE、AD-PHASE-GATE)都會跳過 — gate-check 變成只檢查產出物存不存在。在 `lean` 模式下,phase-gate 的 director 還是會跑(phase gate 正是 lean 模式的用途);跑幾個,由下面的 `workflow` 決定。

**`workflow`**(依 `.claude/docs/workflow-modes.md`):

`gate-check` 是整個專案範圍的,所以 gate 整體的產出物清單(載入的 gate 檔)用專案層級的 `workflow`,
**而且**在驗證 MVP GDD 時,會逐個 system 去查
`workflow_overrides.system_overrides.<system>` — 被釘在較高 tier 的 system,
在 gate 通過之前一定要達到那個 tier 的章節數,不管專案層級的 workflow 是什麼(見 Section 2b,
「Per-system overrides」)。

> **gate-check 遵守 `workflow`,但不受 `automation` 約束。** 產出物
> 清單會依 tier 改變;協作式的提問協定(Collaborative
> Protocol 那一節)一律適用 — phase gate 是刻意設計的人工檢查點,絕對不會自動執行。

**`qa.level`**:控制 phase gate 上的測試強制程度,而 `workflow`
控制需要哪些產出物。`modes.rigor` 會兩個一起設;想只調整強制程度,就明確設定
`qa.level`。在 `minimal`,不套用任何測試 gate — 測試證據和單元測試產出物項目變成非必備,
Section 3 的 `testing.strict` 檢查是 no-op;smoke check 不會放寬(Section 2b)—
不過在這個等級 `/smoke-check` 是不跑遊戲測試的(它的自動化那一列會顯示
WAIVED),所以 build 檢查(有設的話是 `commands.smoke`,否則 `commands.build`)加上
啟動和關鍵路徑檢查就是底線 — 沒人啟動過的 build 就是
NOT ASSESSED — 而沒有測試的專案還是可以通過。在 `standard`,
Logic + Integration 測試必須通過。在 `full`,需要完整的覆蓋率檢查 + regression suite
(覆蓋率下限取 `qa.coverage_minimum`,如果有設的話)。UI 和 Visual/Feel
story 需要保留的截圖不算測試項目:沒有任何 `qa.level` 能放寬它們
(Section 2b)。

**`team.size`**:不會改變 phase gate 派出幾個 director — 小組的寬度
是 `workflow` 這條軸的事(Section 4b)。這個值只影響每個 director 審查裡的
**specialist 深度**。
`individual` 用核心 specialist 組;`small` 用標準組;`studio`
再加上 engine 子 specialist。它絕對不會跳過 director — 跳過 director 是
`review_mode` 的工作。`review_mode` 和 `team.size` 都是由
`modes.rigor` 設定 — 選一個 rigor 就兩個一起設 — 兩者在明確設定時
各自仍會覆蓋那條軸(full-rigor 的專案拿到 `studio` 組;較輕的 tier
拿到 `individual`)。

- **有帶參數**:`/gate-check production` — 驗證是否準備好進入那個特定階段
- **沒帶參數**:用跟
  `/project-stage-detect` 同樣的啟發式自動偵測目前階段,然後**執行前先跟使用者確認**:

  使用 `AskUserQuestion`:
  - Prompt: "Detected stage: **[current stage]**. Running gate for [Current] → [Next] transition. Is this correct?"
  - Options:
    - `[A] Yes — run this gate`
    - `[B] No — pick a different gate`(如果選這個,就顯示第二個選單,列出所有 gate 選項:Concept → Systems Design、Systems Design → Technical Setup、Technical Setup → Pre-Production、Pre-Production → Production、Production → Polish、Polish → Release)
  
  沒帶參數時,不准跳過這個確認步驟。

---

## 2. Phase Gate Definitions

每個 gate 的清單 — 必備產出物、品質檢查,以及它依 workflow tier 的精簡版 —
都放在各自的檔案裡。**只讀目標階段轉換對應的那一列;絕對不要載入其他的。**

| Gate | Definition file |
|------|-----------------|
| Concept → Systems Design | `references/gate-systems-design.md` |
| Systems Design → Technical Setup | `references/gate-technical-setup.md` |
| Technical Setup → Pre-Production | `references/gate-pre-production.md` |
| Pre-Production → Production | `references/gate-production.md` |
| Production → Polish | `references/gate-polish.md` |
| Polish → Release | `references/gate-release.md` |

每個檔案先寫 `full` 的基準,再寫那個 gate 的 `standard` 和 `minimal`
精簡版。套用 Section 1 解析出來的 tier。

## 2b. Workflow Tier Adjustment

**現在就讀 `references/2b-workflow-tier.md` 並照著做** — 這個階段的步驟在那個檔案裡,不在這裡。如果對話在這個階段中被壓縮或恢復過,就再讀一次。

## 3. Run the Gate Check

**現在就讀 `references/3-run-gate-check.md` 並照著做** — 這個階段的步驟在那個檔案裡,不在這裡。如果對話在這個階段中被壓縮或恢復過,就再讀一次。

## 4. Collaborative Assessment

**現在就讀 `references/4-assessment.md` 並照著做** — 這個階段的步驟在那個檔案裡,不在這裡。如果對話在這個階段中被壓縮或恢復過,就再讀一次。

## 5. Output the Verdict

**現在就讀 `references/5-verdict.md` 並照著做** — 這個階段的步驟在那個檔案裡,不在這裡。如果對話在這個階段中被壓縮或恢復過,就再讀一次。

## 6. Update Stage on PASS

**現在就讀 `references/6-update-stage.md` 並照著做** — 這個階段的步驟在那個檔案裡,不在這裡。如果對話在這個階段中被壓縮或恢復過,就再讀一次。

## 7. Closing Next-Step Widget

**現在就讀 `references/7-next-steps.md` 並照著做** — 這個階段的步驟在那個檔案裡,不在這裡。如果對話在這個階段中被壓縮或恢復過,就再讀一次。

## Collaborative Protocol

這個 skill 遵循協作式設計原則:

1. **先掃描**:檢查所有產出物和品質 gate
2. **不確定的就問**:沒辦法驗證的東西,不要假設是 PASS
3. **呈現發現**:秀出完整清單和各項狀態
4. **使用者決定**:判定只是建議 — 接下來怎麼做由使用者做最後決定;
   只有 stage 的寫入會受判定約束(Section 6)
5. **取得核准**:「May I write this gate check report to production/gate-checks/?」
6. **絕對不自動修**:必備產出物缺了,就回報 FAIL 判定,
   並指出要跑哪個 skill(例如「run `/test-setup`」)。不准建立缺少的檔案,也不准
   自動重跑 gate。為了製造 PASS 而建立檔案,等於讓
   gate 失去意義。

**絕對不要**擋住使用者做事 — 判定只決定這個 skill 要不要
寫入新的 stage。CONCERNS 時,使用者可以明確接受所列風險來往前走,
報告會記錄這件事(Section 6);FAIL 或 NOT ASSESSED 時,
stage 維持原樣,直到重跑通過,期間沒有任何東西會阻止使用者
去處理那些阻礙項目。

英文原文

---
name: gate-check
description: "Ready to advance between development phases? PASS/CONCERNS/NOT ASSESSED/FAIL with blockers and required artifacts. 'Can we move to production?'"
argument-hint: "[target-phase: systems-design | technical-setup | pre-production | production | polish | release] [--review full|lean|solo]"
user-invocable: true
allowed-tools: Read, Glob, Grep, Write, Edit, Agent, AskUserQuestion, Bash(bash "*/.claude/skills/gate-check/../../hooks/yaml-helper.sh" resolve_config *), Bash(bash .claude/scripts/artifact-check.sh *), Bash(bash .claude/scripts/gdd-structure-check.sh*), Bash(bash .claude/scripts/adr-dep-graph.sh*), Bash(bash .claude/scripts/set-stage.sh *)
model: opus
---

!`bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys review_mode,workflow,qa.level,testing.strict,performance.enforce,team.size,project.stage,system_overrides`

Resolved above — use as-is; `--review` overrides `review_mode`. No block →
defaults in `.claude/docs/config-resolution.md`.

# Phase Gate Validation

This skill validates whether the project is ready to advance to the next development
phase. It checks for required artifacts, quality standards, and blockers.

**Distinct from `/project-stage-detect`**: That skill is diagnostic ("where are we?").
This skill is prescriptive ("are we ready to advance?" with a formal verdict).

## Production Stages (7)

The project progresses through these stages:

1. **Concept** — Brainstorming, game concept document
2. **Systems Design** — Mapping systems, writing GDDs
3. **Technical Setup** — Engine config, architecture decisions
4. **Pre-Production** — Prototyping, vertical slice validation
5. **Production** — Feature development (Epic/Feature/Task tracking active)
6. **Polish** — Performance, playtesting, bug fixing
7. **Release** — Launch prep, certification

**When a gate passes** (or the user explicitly accepts a CONCERNS verdict's risks — Section 6), update the stage in both `project.yaml` (set `project.stage: <new-stage>`) AND write the new stage name to `production/stage.txt` (single line, e.g. `Production`). Dual-write keeps backward compatibility with hooks that haven't migrated yet. This updates the status line immediately.

---

## 1. Parse Arguments

**Target phase:** `$ARGUMENTS` with any `--review <mode>` pair removed (blank = auto-detect current stage, then validate next transition). `/gate-check --review full` names no phase.

Note: in `solo` mode, director spawns (CD-PHASE-GATE, TD-PHASE-GATE, PR-PHASE-GATE, AD-PHASE-GATE) are skipped — gate-check becomes artifact-existence checks only. In `lean` mode, the phase-gate directors still run (phase gates are the purpose of lean mode); how many of them run is set by `workflow` below.

**`workflow`** (per `.claude/docs/workflow-modes.md`):

`gate-check` runs project-wide, so it uses the project-level `workflow` for the
gate's overall artifact checklist (the loaded gate file), AND consults
`workflow_overrides.system_overrides.<system>` per-system when validating MVP
GDDs — a system pinned to a higher tier must meet that tier's section count
before the gate passes, regardless of the project-level workflow (see Section 2b,
"Per-system overrides").

> **gate-check honors `workflow` but is exempt from `automation`.** The artifact
> checklist changes per tier; the collaborative prompting protocol (the
> Collaborative Protocol section) always applies — a phase gate is a deliberate
> human checkpoint, never auto-run.

**`qa.level`**: controls test enforcement at phase gates, where `workflow`
controls which artifacts are required. `modes.rigor` sets both together; set
`qa.level` explicitly to vary enforcement alone. At `minimal`, no test gates apply — the
test-evidence and unit-test artifact items become non-required and the
Section 3 `testing.strict` check is a no-op; the smoke check is not relaxed (Section 2b) —
but at this level `/smoke-check` runs without game tests (its automated row reads
WAIVED), so the build check (`commands.smoke`, else `commands.build`, when set) and
the launch and critical-path checks are the floor — a build nobody launched is
NOT ASSESSED — and a project with no tests can still pass. At `standard`,
Logic + Integration tests must pass. At `full`, a full coverage check + regression suite are required
(coverage minimum from `qa.coverage_minimum` if set). The retained screenshots
UI and Visual/Feel stories need are not test items: no `qa.level` relaxes them
(Section 2b).

**`team.size`**: does not change how many directors spawn at a phase gate — panel
width is `workflow`'s axis (Section 4b). This value affects only the
**specialist depth within each director's review**.
`individual` uses the core specialist set; `small` the standard set; `studio`
adds engine sub-specialists. It never skips a director — skipping directors is
`review_mode`'s job. Both `review_mode` and `team.size` are set by
`modes.rigor` — one rigor choice sets both — and each still overrides that axis
when set explicitly (a full-rigor project gets the `studio` set; lighter tiers
get `individual`).

- **With argument**: `/gate-check production` — validate readiness for that specific phase
- **No argument**: Auto-detect current stage using the same heuristics as
  `/project-stage-detect`, then **confirm with the user before running**:

  Use `AskUserQuestion`:
  - Prompt: "Detected stage: **[current stage]**. Running gate for [Current] → [Next] transition. Is this correct?"
  - Options:
    - `[A] Yes — run this gate`
    - `[B] No — pick a different gate` (if selected, show a second widget listing all gate options: Concept → Systems Design, Systems Design → Technical Setup, Technical Setup → Pre-Production, Pre-Production → Production, Production → Polish, Polish → Release)
  
  Do not skip this confirmation step when no argument is provided.

---

## 2. Phase Gate Definitions

Each gate's checklist — required artifacts, quality checks, and its workflow-tier
reductions — lives in its own file. **Read only the row for the target phase
transition; never load the others.**

| Gate | Definition file |
|------|-----------------|
| Concept → Systems Design | `references/gate-systems-design.md` |
| Systems Design → Technical Setup | `references/gate-technical-setup.md` |
| Technical Setup → Pre-Production | `references/gate-pre-production.md` |
| Pre-Production → Production | `references/gate-production.md` |
| Production → Polish | `references/gate-polish.md` |
| Polish → Release | `references/gate-release.md` |

Each file states the `full` baseline first, then the `standard` and `minimal`
reductions for that gate. Apply the tier resolved in Section 1.

## 2b. Workflow Tier Adjustment

**Read `references/2b-workflow-tier.md` now and follow it** — this phase's steps are in that file, not here. Read it again if the conversation was compacted or resumed during this phase.

## 3. Run the Gate Check

**Read `references/3-run-gate-check.md` now and follow it** — this phase's steps are in that file, not here. Read it again if the conversation was compacted or resumed during this phase.

## 4. Collaborative Assessment

**Read `references/4-assessment.md` now and follow it** — this phase's steps are in that file, not here. Read it again if the conversation was compacted or resumed during this phase.

## 5. Output the Verdict

**Read `references/5-verdict.md` now and follow it** — this phase's steps are in that file, not here. Read it again if the conversation was compacted or resumed during this phase.

## 6. Update Stage on PASS

**Read `references/6-update-stage.md` now and follow it** — this phase's steps are in that file, not here. Read it again if the conversation was compacted or resumed during this phase.

## 7. Closing Next-Step Widget

**Read `references/7-next-steps.md` now and follow it** — this phase's steps are in that file, not here. Read it again if the conversation was compacted or resumed during this phase.

## Collaborative Protocol

This skill follows the collaborative design principle:

1. **Scan first**: Check all artifacts and quality gates
2. **Ask about unknowns**: Don't assume PASS for things you can't verify
3. **Present findings**: Show the full checklist with status
4. **User decides**: The verdict is a recommendation — the user makes the final call on
   what to do next; only the stage write is bound to it (Section 6)
5. **Get approval**: "May I write this gate check report to production/gate-checks/?"
6. **Never auto-fix**: If required artifacts are missing, report the FAIL verdict and
   name the skill to run (e.g. "run `/test-setup`"). Do NOT create missing files or
   re-run the gate automatically. Creating files to manufacture a PASS defeats the
   gate's purpose.

**Never** block a user from working — the verdict decides only whether this skill
writes the new stage. On CONCERNS the user may advance by explicitly accepting the
listed risks, which the report records (Section 6); on FAIL or NOT ASSESSED the
stage stays where it is until a re-run passes, and nothing stops the user working
on the blockers meanwhile.