# Scope Check
這個 skill 是唯讀的:它會回報發現,但不寫任何檔案。
比對原本規劃的範圍和目前的狀態,偵測、量化並分級
範圍蔓延(scope creep)。
**參數:** `$ARGUMENTS`:整個字串,可以是功能名稱(可能是好幾個字)、sprint 編號或 milestone 名稱。
---
## Phase 1: Find the Original Plan
針對給定的參數,找出基準的範圍文件:
- **功能名稱** → 讀 `design/gdd/[feature].md` 或 `design/` 裡符合的檔案
- **Sprint 編號**(例如 `sprint-3`)→ 讀 `production/sprints/sprint-003.md`(`/sprint-plan` 寫出來的名稱)或類似檔案
- **Milestone** → 讀 `production/milestones/[name].md`
如果找不到文件,回報缺少的檔案然後停下來。沒有
可以比對的基準就不要繼續。要分段讀 GDD:用
Grep 工具(pattern `^#`、content mode)找出你需要的標題,再用 offset 和
limit 讀那些範圍。
---
## Phase 2: Read the Current State
檢查實際上已經實作或進行中的東西:
- 掃描程式碼庫中跟這個功能/sprint 有關的檔案
- 讀 git log 中跟這項工作有關的 commit(`git log --oneline --since=[start-date]`)
- 檢查有沒有 TODO/FIXME 註解,這些暗示著尚未完成的範圍新增
- 如果功能在 sprint 中途,檢查目前進行中的 sprint 計畫
---
## Phase 3: Compare Original vs Current Scope
產出比較報告:
```markdown
## Scope Check: [Feature/Sprint Name]
Generated: [Date]
### Original Scope
[List of items from the original plan]
### Current Scope
[List of items currently implemented or in progress]
> **If Phase 4 will return NOT ASSESSED, do not render the numeric block below.**
> Replace the counts and the Bloat Score with
> `[Baseline | Current state] unusable — see verdict` (whichever side could not
> be read) and give the reason. A rendered
> `Original items: 0 / Net scope change: 0%` one section above a NOT ASSESSED
> verdict re-creates the exact "0% reads as on track" hazard Phase 4 exists to
> kill, one phase earlier — and readers trust a number over a caveat.
### Scope Additions (not in original plan)
| Addition | Source | When | Justified? | Effort |
|----------|--------|------|------------|--------|
| [item] | [commit/person] | [date] | [Yes/No/Unclear] | [S/M/L] |
### Scope Removals (in original but dropped)
| Removed Item | Reason | Impact |
|-------------|--------|--------|
| [item] | [why removed] | [what's affected] |
### Bloat Score
- Original items: [N]
- Current items: [N]
- Items added: [N] (+[X]%)
- Items removed: [N]
- Net scope change: [+/-N] ([X]%)
### Risk Assessment
- **Schedule Risk**: [Low/Medium/High] — [explanation]
- **Quality Risk**: [Low/Medium/High] — [explanation]
- **Integration Risk**: [Low/Medium/High] — [explanation]
### Recommendations
1. **Cut**: [Items that should be removed to stay on schedule]
2. **Defer**: [Items that can move to a future sprint/version]
3. **Keep**: [Additions that are genuinely necessary]
4. **Flag**: [Items that need a decision from producer/creative-director]
```
---
## Phase 4: Verdict
依淨範圍變化給出標準結論:
| Net Change | Verdict | Meaning |
|-----------|---------|---------|
| ≤10% | **PASS** | On Track — within acceptable variance |
| >10–25% | **CONCERNS** | Minor Creep — manageable with targeted cuts |
| >25–50% | **FAIL** | Significant Creep — must cut or formally extend timeline |
| >50% | **FAIL** | Out of Control — stop, re-plan, escalate to producer |
**套用上面那張表之前,先檢查這個百分比有沒有意義。** 只要符合下列任一
情況,就輸出 **NOT ASSESSED**,絕對不要輸出算出來的百分比:
- **基準文件存在,但沒有列舉任何範圍項目**(全是標題、
佔位符,或 `[TO BE CONFIGURED]`)。Phase 1 只在檔案*不存在*時停下來;
這是檔案存在但內容是空的情況,而且更危險,
因為零個項目算出 0% 的淨變化,會被呈現成 **PASS — On
Track**。什麼都沒比對,什麼都沒有「在軌道上」。
- **無法判斷目前的狀態**:沒有相關的原始碼檔案、時間範圍內沒有 commit、
沒有任何進行中的東西可讀。把真正的基準拿去比一個
讀不到的現狀,不是 0% 的變化,也不是零個目前項目算出來的 −100%;
那張表會把兩者都讀成 PASS。
- 分母因為其他任何原因變成零。用沒有任何基準項目算出來的百分比,
不是一個小數字,它根本不是數字。
`NOT ASSESSED` **優先於 PASS**(沒有發生過的比對,不能證明
範圍在軌道上),**排在 CONCERNS 和 FAIL 之後**(已量測到的蔓延
比無法量測的基準更值得處理)。
把結論顯眼地輸出:
```
**Scope Verdict: [PASS / CONCERNS / NOT ASSESSED / FAIL]**
Net change: [+X%] — [On Track / Minor Creep / Significant Creep / Out of Control]
[or: NOT ASSESSED — [which side could not be read, and why]]
```
---
## Phase 5: Next Steps
呈現報告之後,提供具體的後續動作:
- **PASS** → 不需要動作。建議在下一個 milestone 之前再跑一次。
- **NOT ASSESSED** → 說明哪一邊讀不到、怎麼修才會讀得到(補上
基準文件,或把 skill 指向工作實際所在的地方)。
不要提議用同樣的輸入再跑一次,只會產生一樣
的非答案。
- **CONCERNS** → 提議找出 2–3 個砍掉效益最高的新增項目。參照 `/sprint-plan update` 來正式重新界定範圍(如果專案沒有 sprint 計畫,像預設的 minimal workflow,就去編輯 brief 的 build order 來重新界定範圍)。
- **FAIL** → 建議升級給 producer。參照 `/sprint-plan update` 重新規劃(如果專案沒有 sprint 計畫,像預設的 minimal workflow,就編輯 brief 的 build order),或用 `/estimate` 重新建立時程基準。
除了 NOT ASSESSED 之外,每個結論都以這句結尾:
> "Run `/scope-check [name]` again after cuts are made to verify the verdict improves."
(NOT ASSESSED 的結尾是上面那段「怎麼做才會變得可評估」;對同樣的輸入
再跑一次,只會重複那個非答案。)
---
### Rules
- 範圍蔓延就是沒有對應的砍減或時程延長的新增項目
- 不是所有新增都不好,有些是後來發現的需求。但它們必須被承認並納入計算
- 建議要砍什麼時,優先保住核心的玩家體驗,其次才是錦上添花的東西
- 一定要量化範圍變化:「感覺變大了」沒辦法行動,「+35% 項目」才可以英文原文
---
name: scope-check
description: "Scope creep check — current scope versus the original plan. Flags additions, quantifies bloat, recommends cuts. 'Any scope creep?'"
argument-hint: "[feature-name or sprint-N]"
user-invocable: true
allowed-tools: Read, Glob, Grep, Bash(git log *)
model: haiku
---
# Scope Check
This skill is read-only — it reports findings but writes no files.
Compares original planned scope against current state to detect, quantify, and triage
scope creep.
**Argument:** `$ARGUMENTS` — the whole string: a feature name (it may be several words), sprint number, or milestone name.
---
## Phase 1: Find the Original Plan
Locate the baseline scope document for the given argument:
- **Feature name** → read `design/gdd/[feature].md` or matching file in `design/`
- **Sprint number** (e.g., `sprint-3`) → read `production/sprints/sprint-003.md` (the name `/sprint-plan` writes) or similar
- **Milestone** → read `production/milestones/[name].md`
If the document is not found, report the missing file and stop. Do not proceed without
a baseline to compare against. Read a GDD by section: find the headings you need with
the Grep tool (pattern `^#`, content mode) and Read those ranges with offset and
limit.
---
## Phase 2: Read the Current State
Check what has actually been implemented or is in progress:
- Scan the codebase for files related to the feature/sprint
- Read git log for commits related to this work (`git log --oneline --since=[start-date]`)
- Check for TODO/FIXME comments that indicate unfinished scope additions
- Check active sprint plan if the feature is mid-sprint
---
## Phase 3: Compare Original vs Current Scope
Produce the comparison report:
```markdown
## Scope Check: [Feature/Sprint Name]
Generated: [Date]
### Original Scope
[List of items from the original plan]
### Current Scope
[List of items currently implemented or in progress]
> **If Phase 4 will return NOT ASSESSED, do not render the numeric block below.**
> Replace the counts and the Bloat Score with
> `[Baseline | Current state] unusable — see verdict` (whichever side could not
> be read) and give the reason. A rendered
> `Original items: 0 / Net scope change: 0%` one section above a NOT ASSESSED
> verdict re-creates the exact "0% reads as on track" hazard Phase 4 exists to
> kill, one phase earlier — and readers trust a number over a caveat.
### Scope Additions (not in original plan)
| Addition | Source | When | Justified? | Effort |
|----------|--------|------|------------|--------|
| [item] | [commit/person] | [date] | [Yes/No/Unclear] | [S/M/L] |
### Scope Removals (in original but dropped)
| Removed Item | Reason | Impact |
|-------------|--------|--------|
| [item] | [why removed] | [what's affected] |
### Bloat Score
- Original items: [N]
- Current items: [N]
- Items added: [N] (+[X]%)
- Items removed: [N]
- Net scope change: [+/-N] ([X]%)
### Risk Assessment
- **Schedule Risk**: [Low/Medium/High] — [explanation]
- **Quality Risk**: [Low/Medium/High] — [explanation]
- **Integration Risk**: [Low/Medium/High] — [explanation]
### Recommendations
1. **Cut**: [Items that should be removed to stay on schedule]
2. **Defer**: [Items that can move to a future sprint/version]
3. **Keep**: [Additions that are genuinely necessary]
4. **Flag**: [Items that need a decision from producer/creative-director]
```
---
## Phase 4: Verdict
Assign a canonical verdict based on net scope change:
| Net Change | Verdict | Meaning |
|-----------|---------|---------|
| ≤10% | **PASS** | On Track — within acceptable variance |
| >10–25% | **CONCERNS** | Minor Creep — manageable with targeted cuts |
| >25–50% | **FAIL** | Significant Creep — must cut or formally extend timeline |
| >50% | **FAIL** | Out of Control — stop, re-plan, escalate to producer |
**Before applying that table, check that the percentage means something.** Emit
**NOT ASSESSED** instead — never a computed percentage — when any of:
- The **baseline document exists but enumerates no scope items** (all headings,
placeholders, or `[TO BE CONFIGURED]`). Phase 1 stops when the file is *absent*;
this is the case where it is present and empty, and it is the more dangerous
one, because zero items yields a 0% net change that renders as **PASS — On
Track**. Nothing was compared. Nothing was on track.
- The **current state cannot be determined** — no related source files, no commits
in the window, nothing in progress to read. Comparing a real baseline against an
unreadable present is not a 0% change, and not the −100% that zero current
items computes — the table reads both as PASS.
- The denominator would be zero for any other reason. A percentage computed from
no baseline items is not a small number; it is not a number.
`NOT ASSESSED` **outranks PASS** (a comparison that never happened has not shown
scope is on track) and **ranks below CONCERNS and FAIL** (measured creep is more
actionable than an unmeasurable baseline).
Output the verdict prominently:
```
**Scope Verdict: [PASS / CONCERNS / NOT ASSESSED / FAIL]**
Net change: [+X%] — [On Track / Minor Creep / Significant Creep / Out of Control]
[or: NOT ASSESSED — [which side could not be read, and why]]
```
---
## Phase 5: Next Steps
After presenting the report, offer concrete follow-up:
- **PASS** → no action required. Suggest re-running before next milestone.
- **NOT ASSESSED** → say which side was unreadable and what would fix it (populate
the baseline document, or point the skill at where the work actually lives).
Do not offer a re-run against the same inputs — it will produce the same
non-answer.
- **CONCERNS** → offer to identify the 2–3 additions with best cut ratio. Reference `/sprint-plan update` to formally re-scope (if the project has no sprint plan, as on the default minimal workflow, re-scope by editing the brief's build order).
- **FAIL** → recommend escalating to producer. Reference `/sprint-plan update` for re-planning (if the project has no sprint plan, as on the default minimal workflow, edit the brief's build order) or `/estimate` to re-baseline timeline.
End every verdict except NOT ASSESSED with:
> "Run `/scope-check [name]` again after cuts are made to verify the verdict improves."
(NOT ASSESSED ends with what would make it assessable, above — a re-run against
the same inputs would repeat the non-answer.)
---
### Rules
- Scope creep is additions without corresponding cuts or timeline extensions
- Not all additions are bad — some are discovered requirements. But they must be acknowledged and accounted for
- When recommending cuts, prioritize preserving the core player experience over nice-to-haves
- Always quantify scope changes — "it feels bigger" is not actionable, "+35% items" is