快速掃一眼 sprint 進度、burndown 和過時的 story

中文翻譯

---
name: sprint-status
description: "快速精簡的 sprint 快照:burndown 和浮現中的風險,用來掌握現況。'How is the sprint going?'"
argument-hint: "[sprint-number or blank for current]"
user-invocable: true
allowed-tools: Read, Glob, Grep, Bash(bash "*/.claude/skills/sprint-status/../../hooks/yaml-helper.sh" resolve_config *), Bash(bash "*/.claude/skills/sprint-status/../../scripts/story-status.sh"), Bash(bash .claude/scripts/story-status.sh*)
model: haiku
---

!`bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys story_granularity,workflow`



# Sprint Status

這是快速掌握現況的檢查,不是 sprint 審查。它會讀目前的
sprint 計畫和 story 檔案、掃描狀態標記,並在 30 行以內產出一份
精簡的快照。要做詳細的 sprint 管理,用
`/sprint-plan update` 或 `/milestone-review`。

**這個 skill 是唯讀的。** 它絕對不會提議修改、絕對不會要求寫檔,
而且最多只給一個具體的建議。

**`story_granularity`**:它決定
burn-down 判讀的粒度:`coarse`(預設,透過 `rigor: minimal`)是**功能等級**的區塊,`balanced`(`rigor: standard`)是**任務等級**,
`fine` 是 **AC 等級**。

---

## 1. Find the Sprint

**參數:** `$ARGUMENTS`(空白 = 用目前的 sprint)

- 如果有給參數(例如 `/sprint-status 3`),在
  `production/sprints/` 裡搜尋符合 `sprint-003.md`、`sprint-03.md`、`sprint-3.md`
  或類似名稱的檔案(`/sprint-plan` 寫的是三位數)。要回報找到哪個檔案。
- 如果沒有給參數,找 `production/sprints/` 裡最近修改的檔案,
  把它當成目前的 sprint。
- 如果 `production/sprints/` 不存在或是空的:
  - **在 `workflow: minimal` 時,依設計就沒有 sprint**:brief 的
    build order 就是計畫,story 檔案承載它。改為回報
    它的進度,然後停下來:
    1. 下面的清單是在你讀這個 skill 之前,由 `.claude/scripts/story-status.sh`
       印出來的:每個未完成的 story 一行,已經依
       路線的順序排好(`IN_REVIEW`、`IN_PROGRESS`,然後是 `TODO`:`Ready`
       或 `Not Started` 的 story,依 build order),接著是 `BLOCKED`、`OTHER`、
       `NO_STATUS` 和 `COMPLETE` 的數量:

!`bash "${CLAUDE_SKILL_DIR}/../../scripts/story-status.sh"`

    2. 在 15 行以內印出:`Build order: [N] of [M] stories complete`
       取自 `COMPLETE` 那一行(只計算 `Complete` 和 `Done` 的 story:
       `In Review` 不算完成),然後是 **Next**:第一個 `IN_REVIEW`、
       `IN_PROGRESS` 或 `TODO` 那一行的 story。清單已經是
       最新的;不要再跑一次腳本,也不要重新排序 story 檔案:`In Review` 的 story 要先結掉,
       才繼續 `In Progress` 的:它的工作已經寫完了。`IN_REVIEW` 建議
       `/story-done [path]`,`IN_PROGRESS` 或 `TODO` 建議
       `/dev-story [path]`。任何 `BLOCKED` 的 story 要連同它的 blocker 一起點名;它
       絕對不會是 Next。
    3. 每個 story 都是 `Complete`(或 `Done`)→ "Build order done: [M] of [M]
       stories complete." 提供三條路往下走:玩玩這個 build;用 `/create-stories`
       從 brief 加入下一批 story;或者如果遊戲已經超出一頁 brief 的範圍,
       用 `/settings` 提高 `modes.rigor`。
    4. `STORIES none`:完全沒有 story 檔案 → "No stories yet. Run
       `/create-stories` to turn the brief's build order into stories."
    5. 沒有 `IN_REVIEW`、`IN_PROGRESS` 或 `TODO` 那一行,但 `COMPLETE` 那一行
       少於總數:每個未完成的 story 都是 `BLOCKED`、`OTHER`
       (例如 `Draft`)或 `NO_STATUS`。**沒有 Next**,而且 build
       order **沒有**完成:絕對不要說它完成了。印出 `Build order` 那一行,
       然後逐一點名每個 `BLOCKED` 的 story 和它的 blocker(從它的 story
       檔案讀,通常是 `BLOCKED:` 的備註),以及其他每個 story 和它寫的
       狀態。建議一個步驟:第一個 blocker 需要什麼,否則
       就是完成第一個 `Draft` 或沒有狀態的 story,並把它的 Status 設成
       `Ready`。
  - **在 `standard` 或 `full` 時**,回報:"No sprint files found. Start a sprint
    with `/sprint-plan new`." 然後停下來。

完整讀 sprint 檔案。擷取:
- Sprint 編號和目標
- 開始日期和結束日期
- 所有 story 或任務條目,附上它們的優先順序(Must Have / Should Have /
  Nice to Have)、負責人和估算

---

## 2. Calculate Days Remaining

使用今天的日期和 sprint 檔案裡的 sprint 結束日期,計算:
- sprint 總天數(結束減開始)
- 已經過的天數
- 剩餘天數
- 已消耗時間的百分比

如果 sprint 檔案沒有明確的日期,註記 "Sprint dates not
found — burndown assessment skipped."

---

## 3. Scan Story Status

**首先:檢查 `production/sprint-status.yaml`。**

如果它存在,直接讀它:它是權威的事實來源。
擷取每個 story 的 `status`,以及有設定時的 `priority`、`owner` 和 `blocker`:它們填進狀態表的欄位。不需要掃描 markdown。
用它的 `sprint`、`goal`、`start`、`end` 欄位,不要重新解析 sprint 計畫。

**如果 `sprint-status.yaml` 不存在**(舊版 sprint 或第一次設定),
退而掃描 markdown:

1. 如果條目引用了 story 檔案路徑,檢查檔案是否存在。
   讀檔案並掃描狀態標記:DONE、COMPLETE、IN PROGRESS、
   BLOCKED、NOT STARTED(不分大小寫)。
2. 如果條目沒有檔案路徑(sprint 計畫裡的 inline 任務),掃描
   sprint 計畫本身,找那個條目旁邊的狀態標記。
3. 如果找不到狀態標記,分類為 NOT STARTED。
4. 如果引用了檔案但它不存在,分類為 MISSING 並記下來。

使用備援做法時,在輸出底部加一則註記:
"⚠ No `sprint-status.yaml` found — status inferred from markdown. Run `/sprint-plan update` to generate one."

可選的(只做快速檢查,不要做深度掃描):在程式碼根目錄 grep
符合 story 系統 slug 的目錄或檔名,檢查有沒有實作的證據。
這只是提示,不是確定的狀態。

### Stale Story Detection

收集完所有 story 的狀態之後,檢查每個 IN PROGRESS 的 story 是否過時:

- 用**對整組 story 做一次 grep,不要每個 story 各讀一次**
  來解析日期:日期是單獨一行,為了找它而打開每個進行中的 story,
  就是這項檢查的全部成本:
  ```
  Grep pattern="\*{0,2}(Last Updated|Updated|last-updated|updated_at)\*{0,2}[[:space:]]*:" glob="production/epics/**/story-*.md" output_mode="content"
  ```
  那一個 pattern 接受所有欄位名稱的變體。沒有符合的 story 就是
  **沒有日期**,這不等於過時:把它回報成 "never stamped",
  而且不要為它計算天數。

> **`\*{0,2}` 這些包覆是它能運作的根本原因。** `/create-stories` 輸出
> `> **Last Updated**: …`,所以要求單字後面緊接 `:` 的 pattern
> 一個 story 都比對不到。再加上緊接在上面的「沒有符合 = never stamped」規則,
> 那個失敗是靜默的:每個進行中的 story 都回報成 never
> stamped,過時 story 偵測永遠不會觸發。不要使用單純的 `Updated:`
> 錨點。
- 用今天的日期計算距離那個日期的天數。
- 如果日期超過 4 天前,把 story 標記為 **STALE**。(4 天的門檻考慮到週末:星期五最後碰過的 story,要到星期三才會顯示為過時。)
- 如果在 story 檔案裡找不到日期欄位,註記 "no timestamp — cannot check staleness."
- 如果 story 沒有引用的檔案(inline 任務),註記 "inline task — cannot check staleness."

STALE 的 story 會列在輸出表格裡,並收集到一個 "Attention Needed"
段落(見 Phase 5 的輸出格式)。

**過時 story 的升級**:如果任何 IN PROGRESS 的 story 被標為 STALE(4 天以上沒有進展),burndown 的結論
至少升級為 **At Risk**:即使完成百分比在正常的
On Track 範圍內。記錄這個升級的原因:"At Risk — [S] stale story(ies): [title]
([D] days)[, …]":[S] 是 STALE 的 story 數量,每個 story 都用它自己的 [D] 點名,
就是從它自己的 Last Updated 日期起算的天數(不是最久的天數,也不是平均值)。

---

## 4. Burndown Assessment

計算:
- 已完成的任務(DONE 或 COMPLETE)
- 進行中的任務(IN PROGRESS)
- 被阻擋的任務(BLOCKED)
- 尚未開始的任務(NOT STARTED 或 MISSING)
- 完成百分比:(complete / total) * 100

把完成百分比跟已消耗時間百分比做比較,來評估 burndown:

- **On Track**:完成 % 在已消耗時間 % 的 10 個百分點以內,或是領先
- **At Risk**:完成 % 落後已消耗時間 % 10-25 個百分點
- **Behind**:完成 % 落後已消耗時間 % 超過 25 個百分點

如果沒有日期,跳過 burndown 評估,回報 "On Track /
At Risk / Behind: unknown — sprint dates not found."

---

## 5. Output

輸出要精簡。story 狀態表是必備的:不要截斷它。總共目標在 50 行以內;如果沒發現什麼值得注意的,就省略 Emerging Risks 段落。使用這個格式:

```markdown
## Sprint [N] Status — [Today's Date]
**Sprint Goal**: [from sprint plan]
**Days Remaining**: [N] of [total] ([% time consumed])

### Progress: [complete/total] tasks ([%])

| Story / Task         | Priority   | Status      | Owner   | Blocker        |
|----------------------|------------|-------------|---------|----------------|
| [title]              | Must Have  | DONE        | [owner] |                |
| [title]              | Must Have  | IN PROGRESS | [owner] |                |
| [title]              | Must Have  | BLOCKED     | [owner] | [brief reason] |
| [title]              | Should Have| NOT STARTED | [owner] |                |

### Attention Needed
| Story / Task         | Status      | Last Updated   | Days Stale | Note           |
|----------------------|-------------|----------------|------------|----------------|
| [title]              | IN PROGRESS | [date or N/A]  | [N days]   | [STALE / no timestamp — cannot check staleness / inline task — cannot check staleness] |

*(Omit this section entirely if no IN PROGRESS stories are stale or have timestamp concerns.)*

### Burndown: [On Track / At Risk / Behind]
[1-2 sentences. If behind: which Must Haves are at risk. If on track: confirm
and note any Should Haves the team could pull.]

### Must-Haves at Risk
[List any Must Have stories that are BLOCKED or NOT STARTED with less than
40% of sprint time remaining. If none, write "None."]

### Emerging Risks
[Any risks visible from the story scan: missing files, cascading blockers,
stories with no owner. If none, write "None identified."]

### Recommendation
[One concrete action, or "Sprint is on track — no action needed."]
```

---

## 6. Fast Escalation Rules

輸出之前套用這些規則,如果觸發了,把旗標放在輸出的最上面
(狀態表之上):

**Critical flag**:如果 Must Have 的 story 是 BLOCKED 或 NOT STARTED,而且
sprint 剩餘時間少於 40%:

```
SPRINT AT RISK: [N] Must Have stories are not complete with [X]% of sprint
time remaining. Recommend replanning with `/sprint-plan update`.
```

**Completion flag**:如果所有 Must Have 的 story 都是 DONE:

```
All Must Haves complete. Team can pull from Should Have backlog.
```

**Missing stories flag**:如果任何引用的 story 檔案不存在:

```
NOTE: [N] story files referenced in the sprint plan are missing.
Run `/story-readiness sprint` to validate story file coverage.
```

---

## Collaborative Protocol

這個 skill 是唯讀的。它回報的是從磁碟上的檔案觀察到的事實。

- 它不會更新 sprint 計畫
- 它不會改變 story 狀態
- 它不會提議砍範圍(那是 `/sprint-plan update`)
- 它每次執行最多給一個建議

要看某個特定 story 的更多細節,使用者可以直接讀 story 檔案,
或是跑 `/story-readiness [path]`。

要重新規劃 sprint,用 `/sprint-plan update`。
要做 sprint 結束時的回顧,用 `/retrospective`。

英文原文

---
name: sprint-status
description: "Fast, concise sprint snapshot — burndown and emerging risks for situational awareness. 'How is the sprint going?'"
argument-hint: "[sprint-number or blank for current]"
user-invocable: true
allowed-tools: Read, Glob, Grep, Bash(bash "*/.claude/skills/sprint-status/../../hooks/yaml-helper.sh" resolve_config *), Bash(bash "*/.claude/skills/sprint-status/../../scripts/story-status.sh"), Bash(bash .claude/scripts/story-status.sh*)
model: haiku
---

!`bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys story_granularity,workflow`



# Sprint Status

This is a fast situational awareness check, not a sprint review. It reads the
current sprint plan and story files, scans for status markers, and produces a
concise snapshot in under 30 lines. For detailed sprint management, use
`/sprint-plan update` or `/milestone-review`.

**This skill is read-only.** It never proposes changes, never asks to write
files, and makes at most one concrete recommendation.

**`story_granularity`** — it sets the
grain of the burn-down read: **feature-sized** chunks at `coarse` (the default, via `rigor: minimal`), **task-sized**
at `balanced` (`rigor: standard`), **AC-sized** at `fine`.

---

## 1. Find the Sprint

**Argument:** `$ARGUMENTS` (blank = use current sprint)

- If an argument is given (e.g., `/sprint-status 3`), search
  `production/sprints/` for a file matching `sprint-003.md`, `sprint-03.md`, `sprint-3.md`,
  or similar (`/sprint-plan` writes three digits). Report which file was found.
- If no argument is given, find the most recently modified file in
  `production/sprints/` and treat it as the current sprint.
- If `production/sprints/` does not exist or is empty:
  - **At `workflow: minimal` there are no sprints by design** — the brief's
    build order is the plan and the story files carry it. Report progress
    through it instead, then stop:
    1. The list below was printed by `.claude/scripts/story-status.sh`
       before you read this skill: one line per unfinished story, already in
       the route's order (`IN_REVIEW`, `IN_PROGRESS`, then `TODO` — a `Ready`
       or `Not Started` story — in build order), then `BLOCKED`, `OTHER`,
       `NO_STATUS` and the `COMPLETE` count:

!`bash "${CLAUDE_SKILL_DIR}/../../scripts/story-status.sh"`

    2. Print, in under 15 lines: `Build order: [N] of [M] stories complete`
       from the `COMPLETE` line (count only `Complete` and `Done` stories —
       `In Review` is not complete), then **Next**: the story on the first
       `IN_REVIEW`, `IN_PROGRESS` or `TODO` line. The list is already
       current; do not run the script again, and do not re-rank the story files — an `In Review` story is closed before an
       `In Progress` one continues: its work is written. Recommend
       `/story-done [path]` for `IN_REVIEW`, `/dev-story [path]` for
       `IN_PROGRESS` or `TODO`. Name any `BLOCKED` story with its blocker; it is
       never Next.
    3. Every story `Complete` (or `Done`) → "Build order done: [M] of [M]
       stories complete." Offer three ways on: play the build; add the next
       stories from the brief with `/create-stories`; or `/settings` to raise
       `modes.rigor` if the game has outgrown a one-page brief.
    4. `STORIES none` — no story files at all → "No stories yet. Run
       `/create-stories` to turn the brief's build order into stories."
    5. No `IN_REVIEW`, `IN_PROGRESS` or `TODO` line, yet the `COMPLETE` line
       is short of the total — every unfinished story is `BLOCKED`, `OTHER`
       (such as `Draft`) or `NO_STATUS`. There is **no Next**, and the build
       order is **not** done: never say it is. Print the `Build order` line,
       then name each `BLOCKED` story with its blocker — read from its story
       file, usually a `BLOCKED:` note — and each other story with its status
       as written. Recommend one step: what the first blocker needs, or else
       finishing the first `Draft` or unstatused story and setting its Status
       to `Ready`.
  - **At `standard` or `full`**, report: "No sprint files found. Start a sprint
    with `/sprint-plan new`." Then stop.

Read the sprint file in full. Extract:
- Sprint number and goal
- Start date and end date
- All story or task entries with their priority (Must Have / Should Have /
  Nice to Have), owner, and estimate

---

## 2. Calculate Days Remaining

Using today's date and the sprint end date from the sprint file, calculate:
- Total sprint days (end minus start)
- Days elapsed
- Days remaining
- Percentage of time consumed

If the sprint file does not include explicit dates, note "Sprint dates not
found — burndown assessment skipped."

---

## 3. Scan Story Status

**First: check for `production/sprint-status.yaml`.**

If it exists, read it directly — it is the authoritative source of truth.
Extract each story's `status`, and its `priority`, `owner` and `blocker` when set — they fill the status table's columns. No markdown scanning needed.
Use its `sprint`, `goal`, `start`, `end` fields instead of re-parsing the sprint plan.

**If `sprint-status.yaml` does not exist** (legacy sprint or first-time setup),
fall back to markdown scanning:

1. If the entry references a story file path, check if the file exists.
   Read the file and scan for status markers: DONE, COMPLETE, IN PROGRESS,
   BLOCKED, NOT STARTED (case-insensitive).
2. If the entry has no file path (inline task in the sprint plan), scan the
   sprint plan itself for status markers next to that entry.
3. If no status marker is found, classify as NOT STARTED.
4. If a file is referenced but does not exist, classify as MISSING and note it.

When using the fallback, add a note at the bottom of the output:
"⚠ No `sprint-status.yaml` found — status inferred from markdown. Run `/sprint-plan update` to generate one."

Optionally (fast check only — do not do a deep scan): grep the code root for a
directory or file name that matches the story's system slug to check for
implementation evidence. This is a hint only, not a definitive status.

### Stale Story Detection

After collecting status for all stories, check each IN PROGRESS story for staleness:

- Resolve the dates with **one grep across the story set, not a read per story**
  — a date is a single line, and opening every in-progress story to find it is
  the whole cost of this check:
  ```
  Grep pattern="\*{0,2}(Last Updated|Updated|last-updated|updated_at)\*{0,2}[[:space:]]*:" glob="production/epics/**/story-*.md" output_mode="content"
  ```
  That one pattern accepts every field-name variant. A story with no match has
  **no date**, which is not the same as being stale — report it as "never
  stamped" and do not compute an age for it.

> **The `\*{0,2}` wrappers are why this works at all.** `/create-stories` emits
> `> **Last Updated**: …`, so a pattern requiring `:` immediately after the word
> matches no story. Combined with the "no match = never stamped" rule directly
> above, that failure is silent: every in-progress story reports as never
> stamped and stale-story detection never fires. Do not use a bare `Updated:`
> anchor.
- Calculate days since that date using today's date.
- If the date is more than 4 days ago, flag the story as **STALE**. (4-day threshold accounts for weekends — a story last touched on Friday won't appear stale until Wednesday.)
- If no date field is found in the story file, note "no timestamp — cannot check staleness."
- If the story has no referenced file (inline task), note "inline task — cannot check staleness."

STALE stories are included in the output table and collected into an "Attention Needed"
section (see Phase 5 output format).

**Stale story escalation**: If any IN PROGRESS story is flagged STALE (no progress in 4+ days), the burndown verdict
is upgraded to at least **At Risk** — even if the completion percentage is within the normal
On Track window. Record this escalation reason: "At Risk — [S] stale story(ies): [title]
([D] days)[, …]" — [S] is how many stories are STALE, and each is named with its own [D],
the days since its own Last Updated date (not the oldest age, not an average).

---

## 4. Burndown Assessment

Calculate:
- Tasks complete (DONE or COMPLETE)
- Tasks in progress (IN PROGRESS)
- Tasks blocked (BLOCKED)
- Tasks not started (NOT STARTED or MISSING)
- Completion percentage: (complete / total) * 100

Assess burndown by comparing completion percentage to time consumed percentage:

- **On Track**: completion % is within 10 points of time consumed % or ahead
- **At Risk**: completion % is 10-25 points behind time consumed %
- **Behind**: completion % is more than 25 points behind time consumed %

If dates are unavailable, skip the burndown assessment and report "On Track /
At Risk / Behind: unknown — sprint dates not found."

---

## 5. Output

Keep the output concise. The story status table is mandatory — do not truncate it. Aim for under 50 lines total; omit the Emerging Risks section if nothing notable was found. Use this format:

```markdown
## Sprint [N] Status — [Today's Date]
**Sprint Goal**: [from sprint plan]
**Days Remaining**: [N] of [total] ([% time consumed])

### Progress: [complete/total] tasks ([%])

| Story / Task         | Priority   | Status      | Owner   | Blocker        |
|----------------------|------------|-------------|---------|----------------|
| [title]              | Must Have  | DONE        | [owner] |                |
| [title]              | Must Have  | IN PROGRESS | [owner] |                |
| [title]              | Must Have  | BLOCKED     | [owner] | [brief reason] |
| [title]              | Should Have| NOT STARTED | [owner] |                |

### Attention Needed
| Story / Task         | Status      | Last Updated   | Days Stale | Note           |
|----------------------|-------------|----------------|------------|----------------|
| [title]              | IN PROGRESS | [date or N/A]  | [N days]   | [STALE / no timestamp — cannot check staleness / inline task — cannot check staleness] |

*(Omit this section entirely if no IN PROGRESS stories are stale or have timestamp concerns.)*

### Burndown: [On Track / At Risk / Behind]
[1-2 sentences. If behind: which Must Haves are at risk. If on track: confirm
and note any Should Haves the team could pull.]

### Must-Haves at Risk
[List any Must Have stories that are BLOCKED or NOT STARTED with less than
40% of sprint time remaining. If none, write "None."]

### Emerging Risks
[Any risks visible from the story scan: missing files, cascading blockers,
stories with no owner. If none, write "None identified."]

### Recommendation
[One concrete action, or "Sprint is on track — no action needed."]
```

---

## 6. Fast Escalation Rules

Apply these rules before outputting, and place the flag at the TOP of the
output if triggered (above the status table):

**Critical flag** — if Must Have stories are BLOCKED or NOT STARTED and
less than 40% of the sprint time remains:

```
SPRINT AT RISK: [N] Must Have stories are not complete with [X]% of sprint
time remaining. Recommend replanning with `/sprint-plan update`.
```

**Completion flag** — if all Must Have stories are DONE:

```
All Must Haves complete. Team can pull from Should Have backlog.
```

**Missing stories flag** — if any referenced story files do not exist:

```
NOTE: [N] story files referenced in the sprint plan are missing.
Run `/story-readiness sprint` to validate story file coverage.
```

---

## Collaborative Protocol

This skill is read-only. It reports observed facts from files on disk.

- It does not update the sprint plan
- It does not change story status
- It does not propose scope cuts (that is `/sprint-plan update`)
- It makes at most one recommendation per run

For more detail on a specific story, the user can read the story file directly
or run `/story-readiness [path]`.

For sprint replanning, use `/sprint-plan update`.
For end-of-sprint retrospective, use `/retrospective`.