parallel-execution-optimizer

affaan-m | Agent 與工作流 | 原文 | MIT

把任務拆成平行 lane 並隔離寫入範圍,加速又不犧牲正確性

中文翻譯

---
name: parallel-execution-optimizer
description: 把任務拆成由平行 lane 組成的相依圖,加速完成:用 lane 矩陣規劃、批次執行讀取和檢查、依檔案/worktree/branch/服務隔離寫入範圍,最後用驗證表收尾。適用於使用者想靠平行作業、並行 agent、批次 tool call、獨立 worktree、多條獨立驗證 lane,或有範圍限制的同質工作(共用準備工作、逐筆紀錄操作仍須循序)把任務大幅加快,同時不犧牲正確性。
license: MIT
metadata:
  origin: ECC
tools: Read, Write, Edit, Bash, Grep, Glob
---

# Parallel Execution Optimizer

當速度來自「同時做彼此獨立的事」時就用這個 skill:repo 檢視、檔案讀取、API 檢查、瀏覽器檢查、build/test lane、deploy 後的回讀確認,或多 worktree 的實作。如果同質的工作在各筆紀錄之間會重複做同樣沒變的準備,即使每筆紀錄的操作必須循序進行,也可以用它。

## 核心模式

動手之前,先把急迫感變成一張相依圖。

1. 定義目標和完成訊號。
2. 把工作切成 lane。
3. 把每條 lane 標成 parallel、sequential 或 gated。
4. 把獨立的讀取/檢查一起跑。
5. 寫入要依檔案、worktree、branch、服務或資料集隔離。
6. 只有在證據顯示各 lane 相容之後才 merge。
7. 用驗證表收尾,不要只丟一句含糊的「變快了」。

## Lane 矩陣

大規模推進之前,先寫一張精簡的矩陣:

```text
Lane | Can run in parallel? | Write surface | Risk | Verification
Repo scan | yes | none | low | rg/git status outputs
Backend patch | maybe | src/api | medium | unit tests
Frontend patch | maybe | app/components | medium | browser screenshot
Deploy readback | after build | remote service | high | live URL + logs
```

只有在各 lane 的寫入範圍不會互相衝突時,才讓它們平行跑。

## 執行規則

- 把檔案讀取、搜尋、狀態檢查和 metadata 查詢批次處理。
- 大型、彼此無關的實作 lane 要用獨立的 worktree。
- 長時間執行的測試、build、backfill 和 deploy,要在獨立的 session 啟動,之後再有意識地去輪詢。
- 如果某條 lane 發現了會改變計畫的阻礙,就暫停相依的 lane 並更新矩陣。
- 背景程序絕對不可以活過這一輪,除非使用者明確要求要有持續運作的服務。
- 沒有明確的 gate,不要平行執行破壞性指令、migration、對同一張表的寫入,或會影響線上客戶的 deploy。

## 有範圍限制的同質工作

當一個有限的紀錄群組共用已被接受的不變輸入(例如一份對應表和 tool 契約)時,就重複使用準備工作。這樣可以減少重複的探索和任務設定;它並不要求並行寫入。

1. 定義有範圍的紀錄集合、由 owner 定義的完成單位、順序、排除項目、完成訊號、已被接受的對應表/契約版本,以及重新規劃的條件。要依照已接受的來源條件檢查選取範圍是否完整涵蓋;只驗證被選到的紀錄,不能證明這個集合是完整的。
2. 探索共用的來源,並且只準備一次不變的輸入。記錄它們的版本和有效條件;只有在這些條件還成立時才重複使用。
3. 在對每筆紀錄產生影響之前,先檢查它目前的版本、權限、前置條件,以及確切要做的影響。共用的準備工作不等於共用的授權。要求使用針對已檢查版本的條件式寫入、能偵測中途變更的 transaction,或在檢查與寫入期間一直持有的鎖。遇到衝突就停;如果沒有這類保護可用,就不要寫。
4. 驗證該筆紀錄的實際結果。每次驗證成功後,把它的證據和剩餘工作集合一起往下帶。嘗試寫入不等於驗證成功;結果不確定時,要先釐清再重試。
5. 在實際的准入契約允許時,讓一個群組由同一個 executor 處理。如果准入要求分開的寫入種類或階段,就保留這些界線,並根據驗證後回傳的 key 和版本去準備下一個被允許的階段;不要為了速度擴大指派範圍或繞過核准。
6. 只要契約和前置條件仍然有效,就在同一個有範圍的任務內繼續。當出現真實的相依關係、契約變更或風險需要時,才另外建立任務或 review,不要每成功一次就來一次。

### Planner/Executor 範例

下面是一個合成的逐步示範,不是實測的執行時間基準,也不是實際跑過的 connector 測試。紀錄 A、B、C 彼此獨立,使用同一份已接受的對應表 M1 和 tool 契約 T1。寫入保持循序。

```text
Planner:
  group = [A, B, C]
  shared = accepted mapping M1 + tool contract T1 + source references
  verified = {}
  remaining = [A, B, C]

Executor for A:
  confirm shared inputs are still valid
  read A's current version; check permission and prerequisites
  determine exact effect; apply with the same conflict protection; verify outcome
  carry forward verified = {A: outcome evidence}, remaining = [B, C]

Executor for B, then C:
  reuse shared preparation and carried state
  repeat each record's version, permission, prerequisite, effect, outcome checks
  remove a record from remaining only after verifying its success

Replan:
  if T1 changes to T2, pause dependent work and review the changed contract
  if B's prerequisite fails, leave B unresolved and review that dependency
  preserve A's verified evidence; refresh only inputs invalidated by the change
```

往下帶的狀態應該包含:群組、共用輸入的版本和有效條件、每筆紀錄已驗證的結果、未解決/不確定的影響、剩餘的紀錄、已完成工作的排除項目,以及下一個必要的檢查。恢復執行時,要重新驗證可能已經改變的輸入;不要只因為換了新的 executor 接手,就把已完成的操作重做一遍。新的使用者請求或範圍變更,要當成新的契約。

### Connector 變更後恢復

舉一個合成的交接情境:A 已完成,並被排除在後續變更之外;B 失敗,且已確認沒有任何影響;C 從未嘗試;D 的結果不明確。把這些各操作的狀態和證據帶到新的 connector 路徑。A 持續排除。在考慮重試之前,先釐清 D;從仍然被授權的未解決工作重建可執行集合,B 和 C 要等它們的檢查通過才納入。驗證新的 tool 契約,並保留確切要做的影響。不要把原本的批次重新建成可執行狀態,也不要因為後來某次嘗試成功了,就抹掉先前的偏差。

### 評估標準

用這個示範檢查:一般的成功能夠依 A → B → C 推進,不會重複做沒變的來源探索或完整的任務準備。確認契約變更或前置條件失敗時,仍然會觸發相關的 review,每筆紀錄的檢查保持完整,未驗證的結果仍然維持未解決。在 connector 變更時,確認已完成的排除項目有保留下來,失敗/未嘗試的工作需要目前的授權,不明確的影響要先釐清。要把實際執行過的內容和這份提議的評估分開回報。不要從這個範例推斷延遲改善,也不要推斷 ECC/connector 的錯誤歸屬。

對一個已經就緒的群組,在現有的 journal 裡保留就緒、交接和第一個動作的時間。把必要的檢查和核准等待,跟 coordinator 的等待分開;client 端的呼叫重疊並不能證明後端有並行,也不能證明吞吐量改善。如果 GROUP_A 中某個相依步驟被拒絕,就先擱置它,同時讓獲得授權的獨立 GROUP_B 繼續進行。在 owner 的完成單位內維持時間順序,並保留所有被排除的紀錄/區間。要拿某種選取條件的拼寫變體和一筆被排除的紀錄,對照已接受的條件做測試;在任何未準備好的寫入之前,保留被遺漏的合格工作和溢出的部分。檢查版本衝突或沒有衝突保護時,不會產生寫入。這些仍然只是提議的合成檢查,不是在實際系統上執行的結果。

## 輸出格式

回報時用這個格式:

```text
Parallel execution result:
- Lanes run: 5
- Lanes completed: 4
- Blocked lane: deploy readback, waiting on DNS propagation
- Fast path found: batched repo scan + focused tests
- Verification: lint pass, unit pass, live smoke pass
```

## 失敗模式

- 更多並行造成互相衝突的編輯。
- 去 benchmark 工具,而不是任務本身。
- 還沒證明正確就把「快」當成完成。
- 忘了輪詢正在跑的 session。
- 用一句成功摘要把跳過的檢查藏起來。

英文原文

---
name: parallel-execution-optimizer
description: Speed up a task by turning it into a dependency graph of parallel lanes with a lane matrix, batched reads and checks, write surfaces isolated by file, worktree, branch, or service, and a final verification table. Use when the user wants a task done much faster through parallel work, concurrent agents, batched tool calls, isolated worktrees, many independent verification lanes, or bounded homogeneous work that reuses shared preparation while record operations remain sequential, without losing correctness.
license: MIT
metadata:
  origin: ECC
tools: Read, Write, Edit, Bash, Grep, Glob
---

# Parallel Execution Optimizer

Use this skill when speed comes from doing independent work at the same time:
repo inspection, file reads, API checks, browser checks, build/test lanes,
deploy readbacks, or multi-worktree implementation passes. Also use it when
homogeneous work repeats unchanged preparation between records, even if the
record operations must remain sequential.

## Core Pattern

Turn urgency into a dependency graph before acting.

1. Define the objective and done signal.
2. Split work into lanes.
3. Mark each lane as parallel, sequential, or gated.
4. Run independent reads/checks together.
5. Keep writes isolated by file, worktree, branch, service, or dataset.
6. Merge only after evidence shows the lanes are compatible.
7. End with a verification table, not a vague speed claim.

## Lane Matrix

Before a large push, write a compact matrix:

```text
Lane | Can run in parallel? | Write surface | Risk | Verification
Repo scan | yes | none | low | rg/git status outputs
Backend patch | maybe | src/api | medium | unit tests
Frontend patch | maybe | app/components | medium | browser screenshot
Deploy readback | after build | remote service | high | live URL + logs
```

Only run lanes in parallel when their write surfaces do not collide.

## Execution Rules

- Batch file reads, searches, status checks, and metadata queries.
- Use isolated worktrees for large unrelated implementation lanes.
- Start long-running tests, builds, backfills, and deploys in separate sessions,
  then poll them deliberately.
- If a lane discovers a blocker that changes the plan, pause dependent lanes
  and update the matrix.
- Never let a background process outlive the turn unless the user explicitly
  asked for a continuing service.
- Do not parallelize destructive commands, migrations, writes to the same table,
  or live customer-impacting deploys without an explicit gate.

## Bounded Homogeneous Work

Reuse preparation when a finite group of records shares accepted invariant
inputs, such as a mapping and tool contract. This reduces repeated discovery
and task setup; it does not require concurrent writes.

1. Define the bounded record set, owner-defined completion unit, ordering,
   exclusions, done signal, accepted mapping/contract version, and replanning
   conditions. Check selection coverage against the accepted source criteria;
   validating selected records alone does not prove the set is complete.
2. Discover shared sources and prepare invariant inputs once. Record their
   versions and validity conditions; reuse them only while those conditions hold.
3. Before each record's effect, check its current version, permissions,
   prerequisites, and exact intended effect. Shared preparation is not shared
   authorization. Require a conditional write against the checked version, a
   transaction that detects intervening changes, or a lock held across the check
   and write. Stop on a conflict; if no such protection is available, do not write.
4. Verify the actual outcome for that record. Carry forward its evidence and
   the remaining-work set after each verified success. An attempted write is
   not a verified success; reconcile an uncertain outcome before any retry.
5. Keep a group with one executor where the actual admission contract permits
   it. If admission requires separate write kinds or stages, preserve those
   boundaries and prepare the next permitted stage from verified returned keys
   and versions; do not widen an assignment or bypass an approval for speed.
6. Continue within the same bounded task while the contract and prerequisites
   remain valid. Create a separate task or review when a real dependency,
   changed contract, or risk requires it, rather than after every success.

### Planner/Executor Example

The following is a synthetic walkthrough, not a measured runtime benchmark or
an executed connector test. Records A, B, and C are independent and use the
same accepted mapping M1 and tool contract T1. Writes stay sequential.

```text
Planner:
  group = [A, B, C]
  shared = accepted mapping M1 + tool contract T1 + source references
  verified = {}
  remaining = [A, B, C]

Executor for A:
  confirm shared inputs are still valid
  read A's current version; check permission and prerequisites
  determine exact effect; apply with the same conflict protection; verify outcome
  carry forward verified = {A: outcome evidence}, remaining = [B, C]

Executor for B, then C:
  reuse shared preparation and carried state
  repeat each record's version, permission, prerequisite, effect, outcome checks
  remove a record from remaining only after verifying its success

Replan:
  if T1 changes to T2, pause dependent work and review the changed contract
  if B's prerequisite fails, leave B unresolved and review that dependency
  preserve A's verified evidence; refresh only inputs invalidated by the change
```

Carry-forward state should identify the group, shared input versions and
validity conditions, per-record verified outcomes, unresolved/uncertain effects,
remaining records, completed-work exclusions, and the next required check. On
resumption, revalidate inputs that may have changed; do not replay completed effects merely because a new
executor takes over. Treat a new user request or changed scope as a new contract.

### Resume After a Connector Change

For a synthetic handoff, suppose A is completed and excluded from further
changes, B failed with a confirmed absence of effects, C was never attempted, and D has an
ambiguous outcome. Carry those per-operation states and evidence into the new
connector route. Keep A excluded. Reconcile D before considering a retry;
rebuild the executable set from unresolved work that is still authorized,
including B and C only after their checks pass. Validate the new tool contract
and preserve the exact intended effects. Do not rebuild the original batch as
executable or erase earlier deviations because a later attempt succeeds.

### Evaluation Criteria

Use the walkthrough to check that ordinary successes advance A → B → C without
repeating unchanged source discovery or full task preparation. Confirm that a
changed contract or failed prerequisite still triggers the relevant review,
per-record checks remain intact, and unverified outcomes stay unresolved. On a
connector change, confirm completed exclusions survive, failed/unattempted work
requires current authorization, and ambiguous effects are reconciled first. Report
what was actually executed separately from this proposed evaluation. Do not infer
latency improvements or ECC/connector fault attribution from this example.

For an already-ready group, retain readiness, handoff, and first-action times
in the existing journal. Separate required checks and approval waits from
coordinator waiting; client-side call overlap does not prove backend concurrency
or throughput improvement. If a dependent step in GROUP_A is denied, hold it
while authorized independent GROUP_B can proceed. Preserve chronological ordering
within the owner's completion unit and all excluded records/intervals. Test a
selection spelling variant and an excluded record against the accepted criteria;
retain omitted eligible work and overflow before any unprepared write. Check
that a version conflict or unavailable conflict protection produces no write.
These remain proposed synthetic checks, not executed live-system results.

## Output Shape

Use this when reporting:

```text
Parallel execution result:
- Lanes run: 5
- Lanes completed: 4
- Blocked lane: deploy readback, waiting on DNS propagation
- Fast path found: batched repo scan + focused tests
- Verification: lint pass, unit pass, live smoke pass
```

## Failure Modes

- More concurrency that creates conflicting edits.
- Benchmarking the tool instead of the task.
- Treating "fast" as done before correctness is proven.
- Forgetting to poll running sessions.
- Hiding skipped checks behind a success summary.