name: stakeholder-update
description: 依對象和頻率產生量身訂做的利害關係人更新。適用於撰寫給主管層的週報或月報、宣布上線、升級回報風險或阻礙,或把同一份進度轉成給高階主管的簡報、工程細節或對客戶的版本。
argument-hint: "<update type and audience>"
---

# 利害關係人更新

> 如果看到不熟悉的佔位符,或需要確認哪些工具已連接,請見 [CONNECTORS.md](../../CONNECTORS.md)。

依對象和頻率,產生量身訂做的利害關係人更新。

## 用法

```
/stakeholder-update $ARGUMENTS
```

## 工作流程

### 1. 判斷更新類型

問使用者是哪種更新:
- **Weekly(週報)**:固定頻率的更新,講進度、阻礙和下一步
- **Monthly(月報)**:較高層次的摘要,講趨勢、里程碑和策略一致性
- **Launch(上線)**:宣布功能或產品上線,附上細節和影響
- **Ad-hoc(臨時)**:針對特定情況的一次性更新(升級回報、轉向、重大決策)

### 2. 判斷對象

問更新是給誰的:
- **Executives / leadership(高階主管/領導層)**:高層次、以成果為焦點、策略性的框架、簡短
- **Engineering team(工程團隊)**:技術細節、實作背景、阻礙、需要的決策
- **Cross-functional partners(跨職能夥伴)**:適合他們脈絡的細節,聚焦共同目標和相依性
- **Customers / external(客戶/外部)**:以好處為焦點、清楚的時程、沒有內部術語
- **Board(董事會)**:以指標為導向、策略性、聚焦風險、非常精簡

### 3. 從已連接的工具拉脈絡

如果已連接 **~~project tracker**:
- 拉 roadmap 項目和里程碑的狀態
- 找出上次更新以來完成的項目
- 浮出有風險或被卡住的項目
- 拉 sprint 或迭代的進度

如果已連接 **~~chat**:
- 搜尋相關的團隊討論和決策
- 找出在頻道裡提出的阻礙或問題
- 找出非同步做出的關鍵決策

如果已連接 **~~meeting transcription**:
- 拉最近的會議記錄和討論摘要
- 找出相關會議的決策和待辦事項

如果已連接 **~~knowledge base**:
- 搜尋最近的會議記錄
- 找出決策文件或設計審查

如果沒有連接任何工具,請使用者提供:
- 自上次更新以來完成了什麼
- 目前的阻礙或風險
- 已做出或需要的關鍵決策
- 接下來會有什麼

### 4. 產生更新

用下面的範本和框架,為目標對象組織更新內容。

**給高階主管**:TL;DR、狀態顏色(G/Y/R)、與目標連結的關鍵進度、已做的決策、附緩解方案的風險、具體的請求,以及接下來的里程碑。控制在 300 字以內。

**給工程**:出貨了什麼(附連結)、進行中的是什麼(附負責人)、阻礙、需要的決策(附選項和建議)、接下來是什麼。

**給跨職能夥伴**:即將發生、會影響他們的事、你需要他們做什麼(附期限)、影響他們團隊的決策,以及開放給他們提供意見的地方。

**給客戶**:有什麼新東西(以好處的角度描述)、即將推出什麼、已知問題和替代做法,以及如何提供回饋。不用內部術語。

**給上線公告**:什麼上線了、為什麼重要、關鍵細節(範圍、可用性、限制)、成功指標、推出計畫,以及回饋管道。

### 5. 審閱與交付

產生更新之後:
- 問使用者要不要調整語氣、細節程度或強調的重點
- 提議依交付管道調整格式(email、聊天貼文、文件、簡報)
- 如果已連接 **~~chat**,提議起草要寄出的訊息

## 各對象的更新範本

### 高階主管/領導層更新
主管想要的是:策略脈絡、對照目標的進度、需要他們協助的風險、需要他們表態的決策。

**格式**:
```
Status: [Green / Yellow / Red]

TL;DR: [One sentence — the most important thing to know]

Progress:
- [Outcome achieved, tied to goal/OKR]
- [Milestone reached, with impact]
- [Key metric movement]

Risks:
- [Risk]: [Mitigation plan]. [Ask if needed].

Decisions needed:
- [Decision]: [Options with recommendation]. Need by [date].

Next milestones:
- [Milestone] — [Date]
```

**給主管的更新提醒**:
- 先講結論,不要講過程。主管要的是「我們出貨了 X,而且推動了 Y 指標」,不是「我們開了 14 次站會、解掉 23 張工單」。
- 控制在 200 字以內。他們想知道更多會自己問。
- 狀態顏色要反映**你**真正的判斷,不是你以為他們想聽的。Yellow 不是失敗,而是良好的風險管理。
- 只列你想要協助的風險。已經在處理的風險,除非他們需要知道,否則不要列。
- 請求要具體:「Decision on X by Friday」,不是「support needed」。

### 工程團隊更新
工程師想要的是:明確的優先順序、技術脈絡、已解決的阻礙、會影響他們工作的決策。

**格式**:
```
Shipped:
- [Feature/fix] — [Link to PR/ticket]. [Impact if notable].

In progress:
- [Item] — [Owner]. [Expected completion]. [Blockers if any].

Decisions:
- [Decision made]: [Rationale]. [Link to ADR if exists].
- [Decision needed]: [Context]. [Options]. [Recommendation].

Priority changes:
- [What changed and why]

Coming up:
- [Next items] — [Context on why these are next]
```

**給工程的更新提醒**:
- 連結到具體的工單、PR 和文件。工程師想點進去看細節。
- 優先順序變了,要說明原因。工程師搞懂理由之後,投入程度會比較高。
- 明確講出是什麼卡住他們,以及你正在做什麼來解除。
- 不要用不影響他們工作的資訊浪費他們的時間。

### 跨職能夥伴更新
夥伴(設計、行銷、業務、支援)想要的是:有什麼即將發生並影響他們、他們需要準備什麼、怎麼提供意見。

**格式**:
```
What's coming:
- [Feature/launch] — [Date]. [What this means for your team].

What we need from you:
- [Specific ask] — [Context]. By [date].

Decisions made:
- [Decision] — [How it affects your team].

Open for input:
- [Topic we'd love feedback on] — [How to provide it].
```

### 客戶/外部更新
客戶想要的是:有什麼新東西、即將推出什麼、對他們有什麼好處、怎麼開始用。

**格式**:
```
What's new:
- [Feature] — [Benefit in customer terms]. [How to use it / link].

Coming soon:
- [Feature] — [Expected timing]. [Why it matters to you].

Known issues:
- [Issue] — [Status]. [Workaround if available].

Feedback:
- [How to share feedback or request features]
```

**給客戶的更新提醒**:
- 不要內部術語、不要工單編號、不要技術實作細節。
- 一切都用客戶現在可以**做**什麼來描述,不要講你們蓋了什麼。
- 時程要誠實,但不要過度承諾。「Later this quarter」比一個可能錯過的日期好。
- 已知問題只有在影響客戶、而且你們有解決計畫時才提。

## 狀態回報框架

### Green / Yellow / Red 狀態

**Green(On Track,照計畫進行):**
- 照計畫進展
- 沒有重大風險或阻礙
- 有望達成承諾和期限
- 事情真的順利時才用 Green,不要當預設值

**Yellow(At Risk,有風險):**
- 進展比計畫慢,或有風險已經發生
- 緩解措施進行中,但結果不確定
- 沒有介入或調整範圍的話,可能會錯過承諾
- 要主動用 Yellow:越早標出風險,你的選擇越多

**Red(Off Track,偏離軌道):**
- 嚴重落後計畫
- 有重大阻礙或風險,沒有明確的緩解方式
- 沒有重大介入(砍範圍、加資源、延長時程)就會錯過承諾
- 真的需要協助時用 Red。不要等到太遲。

### 何時改變狀態
- 看到風險的**第一個**跡象就轉 Yellow,不要等到確定情況很糟
- 你自己的選項都用盡、需要往上升級時,轉 Red
- 只有風險真正解決、而不是只是暫停時,才轉回 Green
- 改變狀態時要記錄變了什麼:「Moved to Yellow because [reason]」

## 風險溝通

### 風險管理的 ROAM 框架
- **Resolved(已解決)**:風險不再是問題。記錄是怎麼解決的。
- **Owned(已認領)**:風險已被確認,而且有人正在積極管理。寫出負責人和緩解計畫。
- **Accepted(已接受)**:風險已知,但我們選擇不做緩解就繼續。記錄理由。
- **Mitigated(已緩解)**:行動已把風險降到可接受的程度。記錄做了什麼。

### 有效溝通風險
1. **清楚說明風險**:「There is a risk that [thing] happens because [reason]」
2. **量化影響**:「If this happens, the consequence is [impact]」
3. **說明可能性**:「This is [likely/possible/unlikely] because [evidence]」
4. **提出緩解方案**:「We are managing this by [actions]」
5. **提出請求**:「We need [specific help] to further reduce this risk」

### 風險溝通的常見錯誤
- 把風險埋在好消息裡。風險重要時要放最前面。
- 含糊不清:「There might be some delays」,要具體講是什麼、多久、為什麼。
- 只講風險不講緩解方案。每個風險都該附一個計畫。
- 拖太久。早期溝通的風險是規劃的輸入;晚期溝通的風險是救火演習。

## 決策文件(ADR)

### Architecture Decision Record 格式
把重要決策記錄下來,供日後參考:

```
# [Decision Title]

## Status
[Proposed / Accepted / Deprecated / Superseded by ADR-XXX]

## Context
What is the situation that requires a decision? What forces are at play?

## Decision
What did we decide? State the decision clearly and directly.

## Consequences
What are the implications of this decision?
- Positive consequences
- Negative consequences or tradeoffs accepted
- What this enables or prevents in the future

## Alternatives Considered
What other options were evaluated?
For each: what was it, why was it rejected?
```

### 何時該寫 ADR
- 策略性的產品決策(要鎖定哪個市場區隔、要支援哪個平台)
- 重大的技術決策(架構選擇、廠商選擇、自建還是購買)
- 大家意見不同的爭議性決策(記錄理由供日後參考)
- 會限制未來選項的決策(選定一項技術、簽下合作夥伴關係)
- 你預期之後會有人質疑的決策(趁脈絡還新鮮時記下來)

### 決策文件的提醒
- 在做出決策的當下寫 ADR,不要拖到幾週後
- 寫下哪些人參與了決策、誰做了最終決定
- 脈絡要寫得充分:日後的讀者不會有今天的脈絡
- 事後證明是錯的決策也可以記錄,加上「superseded by」連結就好
- 保持簡短。一頁比五頁好。

## 會議主持

### Stand-up / 每日同步
**目的**:浮出阻礙、協調工作、維持動能。
**格式**:每個人分享:
- 自上次同步以來完成了什麼
- 接下來要做什麼
- 有什麼卡住他們

**主持提醒**:
- 控制在 15 分鐘內。如果出現討論,就移到會後。
- 聚焦在阻礙,這是站會裡價值最高的部分
- 追蹤阻礙,並跟進解決狀況
- 沒有東西需要同步就取消站會。尊重大家的時間。

### Sprint / 迭代規劃
**目的**:承諾下個 sprint 的工作。就優先順序和範圍取得共識。
**格式**:
1. 回顧:上個 sprint 出貨了什麼、延遞了什麼、砍掉了什麼
2. 優先順序:這個 sprint 最重要的是要完成什麼
3. 產能:團隊能承擔多少(把請假、on-call、會議算進去)
4. 承諾:從 backlog 選出符合產能和優先順序的項目
5. 相依性:標出任何跨團隊或外部的相依性

**主持提醒**:
- 帶著建議的優先順序來。不要要求團隊從零開始排優先順序。
- 對過度承諾要反駁。承諾少一點、穩穩交付比較好。
- 確保每個項目都有明確的負責人和明確的驗收標準。
- 標出範圍抓得太小或藏有隱藏複雜度的項目。

### 回顧會議(Retrospective)
**目的**:反思哪些做得好、哪些不好,以及要改變什麼。
**格式**:
1. 暖場:提醒團隊目標,並營造心理安全感
2. 蒐集資料:哪些做得好、哪些不好、哪些讓人困惑
3. 產生洞察:找出模式和根本原因
4. 決定行動:挑 1-3 個具體的改進,下個 sprint 試試看
5. 收尾:感謝大家誠實的回饋

**主持提醒**:
- 營造心理安全感。大家必須覺得可以安心說實話。
- 聚焦在系統和流程,不要針對個人。
- 行動項目限制在 1-3 個。超過就什麼都不會改變。
- 跟進上次回顧的行動項目。如果從來不跟進,大家就不再投入了。
- 偶爾換一下回顧的形式,避免僵化。

### 利害關係人審查/Demo
**目的**:展示進度、蒐集回饋、建立共識。
**格式**:
1. 背景:提醒利害關係人目標,以及他們上次看到什麼
2. Demo:展示做了什麼。用真實的產品,不要用簡報。
3. 指標:分享任何早期資料或回饋
4. 回饋:留出結構化的時間讓大家提問和給意見
5. 下一步:接下來有什麼,以及下次審查是什麼時候

**主持提醒**:
- 盡可能 demo 真實產品。簡報不是 demo。
- 框定回饋的蒐集方式:「What feedback do you have on X?」比「Any thoughts?」好
- 把回饋明顯地記錄下來,並承諾處理(或解釋為什麼不處理)
- 先說清楚,在這個階段哪類回饋是可行動的

## 輸出格式

讓更新容易掃讀。重點用粗體,清單用項目符號。給主管的更新要控制在 300 字以內。給工程的更新可以長一點,但結構仍然要方便略讀。

## 小提醒

- 利害關係人更新最常見的錯誤是把重點埋起來。從最重要的事開始。
- 狀態顏色(Green/Yellow/Red)要反映現實,不是樂觀。Yellow 不是失敗,而是良好的風險溝通。
- 請求要具體、可行動。「We need help」不是請求。「We need a decision on X by Friday」才是。
- 對主管,一切都用成果和目標來描述,不要講活動和任務。
- 有壞消息就放最前面。不要把它藏在好消息後面。
- 長度要配合對象的注意力。主管拿到幾個重點就好。工程拿到他們需要的細節。

英文原文

---
name: stakeholder-update
description: Generate a stakeholder update tailored to audience and cadence. Use when writing a weekly or monthly status for leadership, announcing a launch, escalating a risk or blocker, or translating the same progress into exec-brief, engineering-detail, or customer-facing versions.
argument-hint: "<update type and audience>"
---

# Stakeholder Update

> If you see unfamiliar placeholders or need to check which tools are connected, see [CONNECTORS.md](../../CONNECTORS.md).

Generate a stakeholder update tailored to the audience and cadence.

## Usage

```
/stakeholder-update $ARGUMENTS
```

## Workflow

### 1. Determine Update Type

Ask the user what kind of update:
- **Weekly**: Regular cadence update on progress, blockers, and next steps
- **Monthly**: Higher-level summary with trends, milestones, and strategic alignment
- **Launch**: Announcement of a feature or product launch with details and impact
- **Ad-hoc**: One-off update for a specific situation (escalation, pivot, major decision)

### 2. Determine Audience

Ask who the update is for:
- **Executives / leadership**: High-level, outcome-focused, strategic framing, brief
- **Engineering team**: Technical detail, implementation context, blockers, decisions needed
- **Cross-functional partners**: Context-appropriate detail, focus on shared goals and dependencies
- **Customers / external**: Benefits-focused, clear timelines, no internal jargon
- **Board**: Metrics-driven, strategic, risk-focused, very concise

### 3. Pull Context from Connected Tools

If **~~project tracker** is connected:
- Pull status of roadmap items and milestones
- Identify completed items since last update
- Surface items that are at risk or blocked
- Pull sprint or iteration progress

If **~~chat** is connected:
- Search for relevant team discussions and decisions
- Find blockers or issues raised in channels
- Identify key decisions made asynchronously

If **~~meeting transcription** is connected:
- Pull recent meeting notes and discussion summaries
- Find decisions and action items from relevant meetings

If **~~knowledge base** is connected:
- Search for recent meeting notes
- Find decision documents or design reviews

If no tools are connected, ask the user to provide:
- What was accomplished since the last update
- Current blockers or risks
- Key decisions made or needed
- What is coming next

### 4. Generate the Update

Structure the update for the target audience using the templates and frameworks below.

**For executives**: TL;DR, status color (G/Y/R), key progress tied to goals, decisions made, risks with mitigation, specific asks, and next milestones. Keep it under 300 words.

**For engineering**: What shipped (with links), what is in progress (with owners), blockers, decisions needed (with options and recommendation), and what is coming next.

**For cross-functional partners**: What is coming that affects them, what you need from them (with deadlines), decisions that impact their team, and areas open for input.

**For customers**: What is new (framed as benefits), what is coming soon, known issues with workarounds, and how to provide feedback. No internal jargon.

**For launch announcements**: What launched, why it matters, key details (scope, availability, limitations), success metrics, rollout plan, and feedback channels.

### 5. Review and Deliver

After generating the update:
- Ask if the user wants to adjust tone, detail level, or emphasis
- Offer to format for the delivery channel (email, chat post, doc, slides)
- If **~~chat** is connected, offer to draft the message for sending

## Update Templates by Audience

### Executive / Leadership Update
Executives want: strategic context, progress against goals, risks that need their help, decisions that need their input.

**Format**:
```
Status: [Green / Yellow / Red]

TL;DR: [One sentence — the most important thing to know]

Progress:
- [Outcome achieved, tied to goal/OKR]
- [Milestone reached, with impact]
- [Key metric movement]

Risks:
- [Risk]: [Mitigation plan]. [Ask if needed].

Decisions needed:
- [Decision]: [Options with recommendation]. Need by [date].

Next milestones:
- [Milestone] — [Date]
```

**Tips for executive updates**:
- Lead with the conclusion, not the journey. Executives want "we shipped X and it moved Y metric" not "we had 14 standups and resolved 23 tickets."
- Keep it under 200 words. If they want more, they will ask.
- Status color should reflect YOUR genuine assessment, not what you think they want to hear. Yellow is not a failure — it is good risk management.
- Only include risks you want help with. Do not list risks you are already handling unless they need to know.
- Asks must be specific: "Decision on X by Friday" not "support needed."

### Engineering Team Update
Engineers want: clear priorities, technical context, blockers resolved, decisions that affect their work.

**Format**:
```
Shipped:
- [Feature/fix] — [Link to PR/ticket]. [Impact if notable].

In progress:
- [Item] — [Owner]. [Expected completion]. [Blockers if any].

Decisions:
- [Decision made]: [Rationale]. [Link to ADR if exists].
- [Decision needed]: [Context]. [Options]. [Recommendation].

Priority changes:
- [What changed and why]

Coming up:
- [Next items] — [Context on why these are next]
```

**Tips for engineering updates**:
- Link to specific tickets, PRs, and documents. Engineers want to click through for details.
- When priorities change, explain why. Engineers are more bought in when they understand the reason.
- Be explicit about what is blocking them and what you are doing to unblock it.
- Do not waste their time with information that does not affect their work.

### Cross-Functional Partner Update
Partners (design, marketing, sales, support) want: what is coming that affects them, what they need to prepare for, how to give input.

**Format**:
```
What's coming:
- [Feature/launch] — [Date]. [What this means for your team].

What we need from you:
- [Specific ask] — [Context]. By [date].

Decisions made:
- [Decision] — [How it affects your team].

Open for input:
- [Topic we'd love feedback on] — [How to provide it].
```

### Customer / External Update
Customers want: what is new, what is coming, how it benefits them, how to get started.

**Format**:
```
What's new:
- [Feature] — [Benefit in customer terms]. [How to use it / link].

Coming soon:
- [Feature] — [Expected timing]. [Why it matters to you].

Known issues:
- [Issue] — [Status]. [Workaround if available].

Feedback:
- [How to share feedback or request features]
```

**Tips for customer updates**:
- No internal jargon. No ticket numbers. No technical implementation details.
- Frame everything in terms of what the customer can now DO, not what you built.
- Be honest about timelines but do not overcommit. "Later this quarter" is better than a date you might miss.
- Only mention known issues if they are customer-impacting and you have a resolution plan.

## Status Reporting Framework

### Green / Yellow / Red Status

**Green** (On Track):
- Progressing as planned
- No significant risks or blockers
- On track to meet commitments and deadlines
- Use Green when things are genuinely going well — not as a default

**Yellow** (At Risk):
- Progress is slower than planned, or a risk has materialized
- Mitigation is underway but outcome is uncertain
- May miss commitments without intervention or scope adjustment
- Use Yellow proactively — the earlier you flag risk, the more options you have

**Red** (Off Track):
- Significantly behind plan
- Major blocker or risk without clear mitigation
- Will miss commitments without significant intervention (scope cut, resource addition, timeline extension)
- Use Red when you genuinely need help. Do not wait until it is too late.

### When to Change Status
- Move to Yellow at the FIRST sign of risk, not when you are sure things are bad
- Move to Red when you have exhausted your own options and need escalation
- Move back to Green only when the risk is genuinely resolved, not just paused
- Document what changed when you change status — "Moved to Yellow because [reason]"

## Risk Communication

### ROAM Framework for Risk Management
- **Resolved**: Risk is no longer a concern. Document how it was resolved.
- **Owned**: Risk is acknowledged and someone is actively managing it. State the owner and the mitigation plan.
- **Accepted**: Risk is known but we are choosing to proceed without mitigation. Document the rationale.
- **Mitigated**: Actions have reduced the risk to an acceptable level. Document what was done.

### Communicating Risks Effectively
1. **State the risk clearly**: "There is a risk that [thing] happens because [reason]"
2. **Quantify the impact**: "If this happens, the consequence is [impact]"
3. **State the likelihood**: "This is [likely/possible/unlikely] because [evidence]"
4. **Present the mitigation**: "We are managing this by [actions]"
5. **Make the ask**: "We need [specific help] to further reduce this risk"

### Common Mistakes in Risk Communication
- Burying risks in good news. Lead with risks when they are important.
- Being vague: "There might be some delays" — specify what, how long, and why.
- Presenting risks without mitigations. Every risk should come with a plan.
- Waiting too long. A risk communicated early is a planning input. A risk communicated late is a fire drill.

## Decision Documentation (ADRs)

### Architecture Decision Record Format
Document important decisions for future reference:

```
# [Decision Title]

## Status
[Proposed / Accepted / Deprecated / Superseded by ADR-XXX]

## Context
What is the situation that requires a decision? What forces are at play?

## Decision
What did we decide? State the decision clearly and directly.

## Consequences
What are the implications of this decision?
- Positive consequences
- Negative consequences or tradeoffs accepted
- What this enables or prevents in the future

## Alternatives Considered
What other options were evaluated?
For each: what was it, why was it rejected?
```

### When to Write an ADR
- Strategic product decisions (which market segment to target, which platform to support)
- Significant technical decisions (architecture choices, vendor selection, build vs buy)
- Controversial decisions where people disagreed (document the rationale for future reference)
- Decisions that constrain future options (choosing a technology, signing a partnership)
- Decisions you expect people to question later (capture the context while it is fresh)

### Tips for Decision Documentation
- Write ADRs close to when the decision is made, not weeks later
- Include who was involved in the decision and who made the final call
- Document the context generously — future readers will not have today's context
- It is okay to document decisions that were wrong in hindsight — add a "superseded by" link
- Keep them short. One page is better than five.

## Meeting Facilitation

### Stand-up / Daily Sync
**Purpose**: Surface blockers, coordinate work, maintain momentum.
**Format**: Each person shares:
- What they accomplished since last sync
- What they are working on next
- What is blocking them

**Facilitation tips**:
- Keep it to 15 minutes. If discussions emerge, take them offline.
- Focus on blockers — this is the highest-value part of standup
- Track blockers and follow up on resolution
- Cancel standup if there is nothing to sync on. Respect people's time.

### Sprint / Iteration Planning
**Purpose**: Commit to work for the next sprint. Align on priorities and scope.
**Format**:
1. Review: what shipped last sprint, what carried over, what was cut
2. Priorities: what are the most important things to accomplish this sprint
3. Capacity: how much can the team take on (account for PTO, on-call, meetings)
4. Commitment: select items from the backlog that fit capacity and priorities
5. Dependencies: flag any cross-team or external dependencies

**Facilitation tips**:
- Come with a proposed priority order. Do not ask the team to prioritize from scratch.
- Push back on overcommitment. It is better to commit to less and deliver reliably.
- Ensure every item has a clear owner and clear acceptance criteria.
- Flag items that are underscoped or have hidden complexity.

### Retrospective
**Purpose**: Reflect on what went well, what did not, and what to change.
**Format**:
1. Set the stage: remind the team of the goal and create psychological safety
2. Gather data: what went well, what did not go well, what was confusing
3. Generate insights: identify patterns and root causes
4. Decide actions: pick 1-3 specific improvements to try next sprint
5. Close: thank people for honest feedback

**Facilitation tips**:
- Create psychological safety. People must feel safe to be honest.
- Focus on systems and processes, not individuals.
- Limit to 1-3 action items. More than that and nothing changes.
- Follow up on previous retro action items. If you never follow up, people stop engaging.
- Vary the retro format occasionally to prevent staleness.

### Stakeholder Review / Demo
**Purpose**: Show progress, gather feedback, build alignment.
**Format**:
1. Context: remind stakeholders of the goal and what they saw last time
2. Demo: show what was built. Use real product, not slides.
3. Metrics: share any early data or feedback
4. Feedback: structured time for questions and input
5. Next steps: what is coming next and when the next review will be

**Facilitation tips**:
- Demo the real product whenever possible. Slides are not demos.
- Frame feedback collection: "What feedback do you have on X?" is better than "Any thoughts?"
- Capture feedback visibly and commit to addressing it (or explaining why not)
- Set expectations about what kind of feedback is actionable at this stage

## Output Format

Keep updates scannable. Use bold for key points, bullets for lists. Executive updates should be under 300 words. Engineering updates can be longer but should still be structured for skimming.

## Tips

- The most common mistake in stakeholder updates is burying the lead. Start with the most important thing.
- Status colors (Green/Yellow/Red) should reflect reality, not optimism. Yellow is not a failure — it is good risk communication.
- Asks should be specific and actionable. "We need help" is not an ask. "We need a decision on X by Friday" is.
- For executives, frame everything in terms of outcomes and goals, not activities and tasks.
- If there is bad news, lead with it. Do not hide it after good news.
- Match the length to the audience's attention. Executives get a few bullets. Engineering gets the details they need.